You are here: References
Project | Permanent monitoring for mining industry |
Location | 2013 - Talvivaara, Finland |
Description | A new leaching pond was built with a GSE double liner and a floating cover liner for a uranium-mining facility. An MSS® permanent leak detection system was installed by TEXPLOR in 2013. Three MSS® CombiModules control the base liner (double liner), three MSS® cover sensors survey the floating cover, and two MSS® outside sensors produce the energy for the control of the lower sealing. |